“Geo Technical Investigation for construction of Four-Lane with paved shoulder Highway. The Project starts from Design Chainage km 86+700 of National Highway 709AD near Muzaffarnagar to Design Chainage km 123+450 {Existing Chainage Km 30.600 of NH-709AD(Old SH-12A)} near Miranpur including overlap section of Design Km 86.700 to Design Km 97.450 {Existing Chainage Km 5.074 of NH-709AD(Old SH-12A)} over NH-58, in the State of Uttar Pradesh.”

“Geo Technical Investigation for construction of Four-Lane with paved shoulder Highway. The Project starts from Design Chainage km 86+700 of National Highway 709AD near Muzaffarnagar to Design Chainage km 123+450 {Existing Chainage Km 30.600 of NH-709AD(Old SH-12A)} near Miranpur including overlap section of Design Km 86.700 to Design Km 97.450 {Existing Chainage Km 5.074 of NH-709AD(Old SH-12A)} over NH-58, in the State of Uttar Pradesh.”